Hangzhou Fuyang Dongshan Plastic Machinery Co., Ltd. specialized in manufacturing EPS, EPP foam plastics machine for nearly 20 years with integrating independent R&D, manufacture, sales and service.
Category:Product Categories
Products Detail
| Model | GBEC-1325-4X |
| Lathe body | Thick and Hard Steel structure (sandblast & seasoning) |
| X Y axis working area | 1300*2500mm |
| Z axis travel | 500mm |
| Rotary diameter | 1000mm |
| Precision Machining | 0.05mm/ 1000mm |
| Max Traverse Speed | 30m/ min |
| Max processing speed | 15m/ min |
| Table size | 1400*2700mm |
| Resolution | 0.01—0.05 mm |
| Spindle power rate | 4 kw high speed motor,with water cooling |
| X. Y axis,Z structure | Flat liner /servo motor (leisai) Z axis -ball screw |
| Motor of rotary axis | Stepper Motor |
| Guide Rail | 25mm |
| Small Electronic parts | Schneider |
| Spindle rotating speed | 0-24000r/min |
| Standard Power | AC380V--Three Phase |
| Clamping mode | By Slots |
| Diameter of cutter | φ3. 175-φ16 |
| De-duster | With de-duster |
The Feature of machine:
1. Heavy Hard Steel Lath Body, keep the machine's working High stability.Whole machine is welded with seamless steel structure
2. Software
3D drawing software : ArtCAM
3X3D-4X Drawing software : Powermill , Beijing JD
Cutting system : RichAUTO A18 for 4 X file : *. NC (operation)3. Has the function of re-carving after break point and power failure.
4. Has the function of forecasting process time.
5. with oil-inject system, which makes maintenance much easier
6.Tools' Specification: You can choose different diameter and length tool according to your processing . 7.This machine can cut Wood, PVC & EPS after changing the cutting tool.
COMMISSIONING & TEST RUNING:
1.the Seller will prepared necessary material for testing and training for coating.
2. the seller will provide more photos and vedio for start up. As well as on-line service.
3.If client required, Seller will send one person to buyer`s place for start up and commission.But the buyer will cover round way ticket, accommodation , local transportation, interpreter andother necessary
things during commissioning & tests running period. Plus USD100/day per person will be charged as commission fee. Estimate commissioning & test-running periods will take about 5 working days by 1 person;
Video
Hotline:+86-571-63256655
Time:8:00 - 24:00